01 / FLAGSHIP
X-Power TMT 500W
Thermo-mechanically treated reinforcement designed to combine strength, ductility and weldability.
Explore specifications ↗Products & Operations
High-yield thermo-mechanically treated rebars for structural reinforcement, engineered for ductility, weldability, and bond strength.
OUR STEEL
TMT processing combines hot rolling with controlled water quenching. It develops a tempered outer layer around a ductile core, bringing strength and bend performance together.

01 / FLAGSHIP
Thermo-mechanically treated reinforcement designed to combine strength, ductility and weldability.
Explore specifications ↗02 / PREMIUM
03 / STANDARD
A reinforcing-bar range for residential and general construction.
Explore specifications ↗PRODUCT CAMPAIGNS
Explore the bendability and weldability messages behind X-Power TMT.
PRODUCT CAMPAIGN
Explore the bendability message behind X-Power TMT.
PRODUCT CAMPAIGN
Explore the weldability message behind X-Power TMT.
TECHNICAL REFERENCE
Parameters reproduced from the supplied specification, which cites BDS ISO 6935-2:2006. Confirm current certification and product suitability with RSRM.
| Diameter (mm) | Area (mm²) | Mass (kg/m) | Tolerance | Standard applications |
|---|---|---|---|---|
| 8 | 50.3 | 0.395 | ± 7.0% | Stirrups, ties, light slab reinforcements |
| 10 | 78.5 | 0.617 | ± 6.0% | Slabs, stairs, secondary beams |
| 12 | 113.1 | 0.888 | ± 6.0% | Floor slabs, beams, residential columns |
| 16 | 201.1 | 1.578 | ± 5.0% | Structural columns, main beams, girders |
| 20 | 314.2 | 2.466 | ± 5.0% | Heavy load columns, foundation mats |
| 22 | 380.1 | 2.980 | ± 5.0% | Multi-story columns, retaining structures |
| 25 | 490.9 | 3.853 | ± 4.0% | Bridge piers, flyover columns, heavy foundations |
| 28 | 615.8 | 4.830 | ± 4.0% | Heavy civil structures, industrial plants |
| 32 | 804.2 | 6.313 | ± 4.0% | Megastructure foundations, deep piles |
Other standards referenced by the specification: ASTM A615 (Grade 40, Grade 60), BS 4449, and JIS G3112. Historical certificates and test reports are available below. Confirm current certification with RSRM.
FROM RAW MATERIAL TO REINFORCEMENT
A connected route from selected raw materials to finished steel.

Material selection begins the journey. Melting, refining, casting and rolling connect the steelmaking shop with the finished bar.
Watch film FACTORY & OPERATIONS
A short look inside RSRM’s steel manufacturing operations.
Raw materials are selected, graded and checked before entering the melting process.
Scrap and other steelmaking inputs are melted. Chemical analysis helps control the composition of the molten steel.
Secondary refining brings chemistry and temperature together and removes unwanted impurities before casting.
Molten steel is solidified into billets for the rolling stage.
Billets are reheated and passed through rolling stands to form reinforcing bars.
Water quenching and cooling develop the TMT structure. Finished bars then undergo laboratory checks and final inspection.
Manufacturing stages adapted from RSRM’s company prospectus.
QUALITY ASSURANCE
Chemistry, mechanical properties and bend performance each have a place in the laboratory process.
LABORATORY & TESTING
Spectrometric analysis checks steel chemistry at the heat stage.
LABORATORY & TESTING
Universal testing assesses yield strength, tensile strength and elongation.
LABORATORY & TESTING
Microscopy and bend/rebend testing support assessment of the bar’s structure and performance.
LABORATORY & TESTING
Finished bars are inspected before dispatch. Historical BSTI and BUET records are available in the technical downloads below.
Laboratory practices described in RSRM’s company prospectus.
TECHNICAL DOWNLOADS
Historical BSTI certification and BUET test reports. These dated records do not establish current product certification.
5 documents
October 2014 · Technical Certificates & Reports · PDF · 2.2 MB
BUET-Test-Report-400W-G-60-October-2014.pdf
October 2014 · Technical Certificates & Reports · PDF · 2.0 MB
BUET-Test-Report-500W-October-2014.pdf
May 2014 · Technical Certificates & Reports · PDF · 2.1 MB
BUET-Test-Report-May-2014.pdf
February 2014 · Technical Certificates & Reports · PDF · 4.0 MB
BUET-Test-ReportFebruary-2014.pdf
2014 · Technical Certificates & Reports · PDF · 795.8 KB
BSTI-Certificate-2014.pdf
No documents match your search. Try another term or clear the filters.
LET’S BUILD TOGETHER